The Painting Quote Checklist, and How to Compare Two Quotes That Look Different
The best predictor of a calm painting job is not the painter’s website, the number of reviews, or even the price. It is whether the quote you are holding names the work in enough detail that two people would agree on what “done” means. Here is what that takes, as a list you can hold two quotes up against.
1. Surfaces, by name
Which rooms, or which elevations. Within each: walls, ceiling, baseboards, casing, crown, doors (one side or both), windows, closets, railings. “Paint the living room” is not a scope. “Living room walls and ceiling, baseboards and two doors both sides, casings excluded” is.
For exteriors: siding by material, trim, fascia and soffit, porch ceiling, railings, shutters, garage doors, and whether the foundation, the chimney or the fence is in or out.
2. The condition of each surface, and the prep that follows
This is where quotes diverge and where low ones hide. The scope should say what the painter found and what they will do about it:
- Filling and sanding of holes and cracks, and roughly how much (a few nail holes is not a water-stained corner).
- Deglossing or sanding of previously glossed trim.
- Scraping of failed paint, on which elevations.
- Sanding of weathered bare wood to sound wood.
- Caulking of joints and gaps, with what.
- Priming: spot priming of repairs and bare wood, or a full prime coat, and with which primer. Bare cedar wants an oil primer; new drywall wants a drywall sealer; glossy trim wants a bonding primer.
- Anything found that is being excluded: rot, water damage, wallpaper, lead paint in a pre-1978 home.
3. Products and sheens
The brand and line for each surface, not “premium paint”. Wall paint, ceiling paint, trim enamel, primer. And the sheen: flat or matte on ceilings, eggshell or satin on walls, satin or semi-gloss on trim and doors. A quote that says “two coats of quality paint” has told you nothing you can check on the can.
4. Coats
Two coats on a color change, one on a same-color refresh over sound paint, is the honest rule, and the scope should say which applies to which surface. A dark-to-light change may need a third; the scope should say if the painter thinks so and what it costs if it does.
5. Protection
Floors covered wall to wall, furniture moved and covered, vents sealed while sanding, plantings and walks covered outside, and what happens at the end of each day. Ask, specifically, whether the house is usable each evening.
6. Schedule
A start date, a realistic number of working days, the order of rooms or elevations, and what moves the date: weather for exteriors, drying time between coats, a room that turns out to need more prep. The quote should also say what hours the crew keeps.
7. Price, payment and what changes it
The total, what deposit starts the job and when the balance is due. Then the important line: what happens when something is found behind the paint that was not in the scope. The right answer is a written change order, priced and approved before the work happens. The wrong answer is a bigger final invoice.
8. Insurance, warranty and the walkthrough
A certificate of insurance on request, the length of the workmanship warranty and what it covers, and a final walkthrough with you before the last payment. The walkthrough is where the written scope earns its keep: you are checking the work against a list, not against a memory of a conversation.
Comparing two quotes
Lay them side by side and go down the list above. Where one quote is silent, assume the work is not included. Nine times out of ten the price gap is sitting in section 2: one painter is scraping, sanding, sealing and priming the two elevations that need it, and the other is washing and rolling. The second job costs less because it is a smaller job, not because that painter is more efficient, and you will pay the difference in three years when it peels.
That is the standard we write to. Our own numbers are on the pricing page, the estimator gives you a range for your rooms before anyone visits, and the projects pages show what a written scope turned into.
FAQs
Why are two painting quotes so far apart?
Almost always because they are not quoting the same job. One includes scraping and priming the failed elevations and the other is a wash and two coats. Put the two scopes side by side and the gap is usually sitting in what one of them left out.
Should I always take the middle quote?
No. Take the quote whose scope matches what your house needs and whose exclusions you understand. The middle number with a vague scope is the one that grows once the work starts.
Is a verbal promise part of the scope?
Only if it ends up on the paper. If a painter says they will prime the bare wood, ask for it to be written in. The written scope is what the final walkthrough is checked against.